Summary
Overview
Work History
Education
Skills
Websites
Timeline
Generic
RICHARD L STOCKWELL III

RICHARD L STOCKWELL III

Saint Clair,MO

Summary

Versatile and goal-oriented professional carpenter with excellent time management and problem-solving skills. Known for reliability and adaptability, with swift capacity to learn and apply new skills. Committed to leveraging these qualities to drive team success and contribute to organizational growth.

Overview

9
9
years of professional experience

Work History

Millwright

Acme Constructors
01.2025 - Current
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Made repairs and modified equipment by welding, soldering and brazing to avoid production delays.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Adeptly utilized a range of hand tools, power tools, and precision measuring instruments to ensure accurate workmanship in all tasks.
  • Operated machine tools to fabricate parts during overhaul, maintenance, or setup of machineries.
  • Conducted comprehensive inspections of machinery to identify potential problems and ensure optimal performance.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Read and interpreted blueprints and schematics to understand machinery design and layout.

Punchlist Superintendent

Brinkmann Constructors
11.2023 - 06.2024
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Established effective quality control measures for consistent delivery of high-quality construction projects.
  • Evaluated subcontractor performance regularly, ensuring adherence to contract requirements and maintaining accountability throughout the lifecycle of each project.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Collaborated with architects, engineers, and contractors to achieve seamless project execution.

Carpenter/Millwright

Alberici Corporation
06.2019 - 11.2023
  • Optimized workspace organization by maintaining a clean, safe, and efficient work environment throughout each project''s duration.
  • Contributed to successful completion of commercial projects by construction of various components on projects such as:
  • Lock and dam concrete work - construction of gangforms.
  • Formwork and leveling multi-form systems-subgrade beams and mechanical pads.
  • Fabrication of custom templates for imbeds
  • Measured materials to determine sizes and quantity required for construction project.
  • Concrete 'blockout' form construction and installation.
  • Troubleshooting of concrete formwork.
  • Construction of Bridgework over bodies of water
  • Maintenance of factories and machines during shutdowns
  • Hospital Remodels and steampipe relocation from building to building.
  • Framing of new walls by metal stud or wooden stud
  • Installing Drywall per the blueprint specifications on specialized projects.
  • Fireproofing, firetaping, and firecaulking various penetrations in concrete, cmu, or drywall systems.
  • Insulation of pipes, walls, and fireplace systems.

Carpenter

Duggan Contracting Corp.
03.2019 - 06.2019
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Specialized in specific carpentry tasks such as framing, finish work, or restoration projects to provide clients with tailored services and high-quality results.
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Read and interpreted blueprints to follow specifications of projects.
  • Contributed to successful completion of residential and commercial projects per the customer's specifications.
  • Repaired existing structures such as staircases, decks, or door frames with precision to extend their lifespan without compromising structural integrity or aesthetics.
  • Assisted in training new carpenters to demonstrate techniques, apply best practices and comply with protocols and regulations.

Carpenter

Lee Allen Roofing and Siding
03.2018 - 02.2019
  • Allocated time at beginning of each job to identify the hazards of the new jobsite and make a plan to effectively protect everyone working on the project.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Strengthened team collaboration through effective communication and problem-solving skills during exterior trim projects.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Contributed to successful completion of residential and commercial projects by skillfully installing siding, soffit, fascia, and waterproofing per the blueprint specifications.
  • Exterior water-proofing
  • Assisted in site preparation and cleanup activities to ensure efficient project workflow and minimize disruptions for clients or other construction teams.
  • Skillfully set up temporary scaffolding systems to ensure the tasks could be completed in a safe and timely manner.

Carpenter

Fregalette Construction
03.2017 - 03.2018
  • Residential framing of new construction homes
  • Layout of walls, stairs, windows, etc
  • Installation of windows and doors
  • Balloon frame wall systems, subfloor systems, and installation
  • Exterior wrap installation

Carpenter

Cheltenham Construction Services
05.2016 - 02.2017
  • Residential framing of new construction houses
  • Balloon framing of walls, subfloors, and stringer and stairs
  • Wall exterior wrapping
  • Decking

Education

Associate of Applied Science - Project Management

Ivy Tech Community College of Indiana
Indianapolis, IN
12.2025

Some College (No Degree) - Architectural Engineering

East Central College
Union, MO

High School Diploma - undefined

Saint Clair High School
Saint Clair, MO
05.2008

Skills

  • Over 15 years experience in Construction
  • Microsoft office skills; outlook, excel, word
  • Subcontractor supervision
  • Blueprint interpretation
  • Mig, Stick welding experience
  • OSHA regulations
  • Change orders management
  • Teamwork and collaboration
  • Effective communication
  • Critical thinking

Timeline

Millwright

Acme Constructors
01.2025 - Current

Punchlist Superintendent

Brinkmann Constructors
11.2023 - 06.2024

Carpenter/Millwright

Alberici Corporation
06.2019 - 11.2023

Carpenter

Duggan Contracting Corp.
03.2019 - 06.2019

Carpenter

Lee Allen Roofing and Siding
03.2018 - 02.2019

Carpenter

Fregalette Construction
03.2017 - 03.2018

Carpenter

Cheltenham Construction Services
05.2016 - 02.2017

Some College (No Degree) - Architectural Engineering

East Central College

High School Diploma - undefined

Saint Clair High School

Associate of Applied Science - Project Management

Ivy Tech Community College of Indiana
RICHARD L STOCKWELL III