Summary
Overview
Work History
Education
Skills
Timeline
Generic

Kody Souza

El Dorado Springs

Summary

Dynamic Fiber Optic Splicer with a proven track record at Phantom Fiber, excelling in fusion splicing and network troubleshooting. Recognized for enhancing service quality through meticulous equipment maintenance and training new technicians. Adept at collaborating with project managers to ensure timely project completion while upholding safety standards and craftsmanship.

Overview

17
17
years of professional experience

Work History

Fiber Optic Splicer

Phantom Fiber
01.2020 - Current
  • Upheld high standards of craftsmanship while working under challenging conditions, including inclement weather or confined spaces.
  • Assisted in the training of new technicians, imparting knowledge of industry best practices and safety protocols.
  • Achieved optimal network performance by splicing fiber optic cables with precision and speed.
  • Improved service quality by regularly inspecting and maintaining fiber optic equipment and tools.
  • Collaborated with project managers to ensure timely completion of large-scale fiber optic installation projects.
  • Ensured accurate documentation of splicing work, maintaining detailed records for future reference.

Millwright Foreman

Robinson Construction Company
01.2018 - 11.2019
  • Prioritized tasks strategically, addressing pressing issues promptly while managing long-term objectives.
  • Implemented quality control measures to minimize errors and maintain high standards of workmanship.
  • Streamlined workflow with proper equipment placement and preventive maintenance.
  • Improved efficiency by maintaining and repairing machinery in a timely manner.
  • Managed a team of millwrights for increased productivity and job satisfaction.
  • Oversaw project completion on time by coordinating schedules and resources effectively.
  • Trained new hires to ensure they quickly became valuable members of the team.
  • Led toolbox talks before shift starts, promoting awareness about potential hazards and ways to mitigate them.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Made repairs and modified equipment by welding, soldering and brazing to avoid production delays.

Pipe Fitter

Systems Contracting
10.2015 - 10.2017
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Maintained high-quality standards through consistent attention to detail while fitting pipes according to building code requirements.

Pipe Fitter

Westcon Bilfinger
10.2008 - 08.2015

started with the company as a laborer and through on site training and learning from peers. moved my way up to structural and piping systems fitting and welding.


taking safety classes and operator classes to be more valuable for the company to go where they needed me and to be able to operate and do multiple jobs

Education

General Education

North East Vernon County
Walker, MO
05-2007

Skills

  • Fiber optic safety
  • Fiber termination
  • Fiber optic routing
  • Fusion splicing
  • Fiber identification
  • Network troubleshooting
  • Color code knowledge
  • Splice enclosure assembly
  • Cable preparation
  • OTDR testing
  • Fault isolation

Timeline

Fiber Optic Splicer

Phantom Fiber
01.2020 - Current

Millwright Foreman

Robinson Construction Company
01.2018 - 11.2019

Pipe Fitter

Systems Contracting
10.2015 - 10.2017

Pipe Fitter

Westcon Bilfinger
10.2008 - 08.2015

General Education

North East Vernon County
Kody Souza