Projects Undertaken (Local Project)
Macau Airport Electrical Power Substation (June 2025 – Present).
- Coordinated activities among architects, designers, engineers, and contractors throughout project lifecycle.
- Prepared design documents and drawings while managing statutory submissions.
LRT – East Line South DD – (May 2023 – present).
- Prepared comprehensive design drawings to meet project objectives.
- Utilized advanced modeling software for effective project planning and visualization.
- Consulted clients to explore design options within budget and aesthetic preferences.
- Organized client meetings with joint venture teams to ensure alignment on project goals.
- Conducted meetings with government representatives regarding project compliance and approvals.
- Managed project timelines and deliverables for timely completion.
- Compiled materials and documents for permitting processes, including detailed specifications.
- Coordinated with architects, designers, engineers, and contractors throughout project lifecycle.
LRT – A3 Footbridge – March 2024 – present, Macau Project.
- Created detailed blueprints, drawings, and schematics for proposed structures.
- Researched zoning ordinances and building codes to ensure compliance with regulations.
- Developed comprehensive plans and specifications tailored to client requirements.
- Conducted site visits to evaluate potential locations for new construction projects.
- Coordinated activities among architects, designers, engineers, and contractors throughout project lifecycle.
- Prepared presentations for client meetings to effectively communicate project designs.
- Crafted oral and written proposals to present innovative project designs.
LRT – SPV – (September 2023 – October 2024), Macau Project.
- Coordinated project activities to ensure timely completion and adherence to specifications.
- Responded to RFIs, facilitating clear communication between stakeholders.
- Conducted site inspections to address issues promptly during construction phases.
Macau OWTF Tender Design (November 2022 - February 2023)
- Evaluated zoning ordinances, building codes, and additional regulations associated with tender
LRT - Heng Qin Extension – (August 2021 - December 2024), Macau Project.
- Prepared detailed drawings.
- Utilized modeling software to enhance project planning.
- Consulted with clients to discuss design options based on their budget constraints, or aesthetic preferences.
- Managed timelines and deliverables.
- Preparing materials and documents for the permitting process.
- Specification preparation.
- Coordinated activities between architects, designers, engineers, and contractors throughout the duration of a project.
- Conducted site inspections to address issues promptly during construction phases.
LRT – East Line Bidding Preparation (November 2022 - February 2023)
- Executed bidding design drawings and documents preparation
Lot P – FB1 (August 2021 - May 2022)
- Prepared materials and documents for permitting process to ensure compliance with regulations.
- Executed specification preparation to meet project requirements efficiently.
Other Project (HK Project).
CLP Black Point Power Station Pump House Design (August 2024 – Present)
- Completed GBP preparation tasks.
- Completed comprehensive design preparation.
- Executed statutory submissions.
CLP Black Point Power Station HRSG and TBH Lifting A&A Works (August 2024 – present), HK Project.
- Completed GBP preparation tasks.
- Coordinated activities between engineers throughout the project.
- Executed statutory submissions.
CLP Offshore Helideck A&A Works (August 2024 – Present), HK Project.
- Completed GBP preparation tasks.
- Coordinated activities between engineers throughout the project.
BESS electrical substation A&A.
- Completed GBP preparation tasks.
- Executed statutory submissions.
- Coordinated activities between engineers throughout the project.
HSK DCS Phase I, Stage 1 (February 2023 - June 2023), HK Project.
1. Tung Chung West Sewage Pump House Station.
2. Tung Chung West Sewage Pump House Station.
3. Ma Wan Chung Sewage Pump House Station.
4. Shek Mum Kup Public Toilet.
- Enhanced project outcomes through accurate drawing preparation.
- Coordinated activities between architects, designers, and engineers throughout the duration of a project.
- Prepared detailed design drawings.